Investors buying a new build have traditionally used a construction loan. 10/90 is the smarter way to buy, for three reasons. You pay 10% to secure the property and the other 90% when it is finished. There is no construction loan charging you interest while the house goes up. The builder also funds the build, which gives you real peace of mind if a builder ever runs into trouble before your home is finished.
How Does a Construction Loan Work?
A construction loan is a home loan designed for building a new home. Instead of paying the full loan amount in one lump sum, as a standard home loan does, the lender pays your builder in stages as the house goes up. These are called progress payments, and the payment schedule is set out in your building contract.
Most fixed price building contracts across Australia use five stages:
1. Slab. The base is poured.
2. Frame. The walls and roof frame go up.
3. Lock-up. The roof, windows and outside doors are in.
4. Fixing. The kitchen, bathrooms and internal fittings go in.
5. Completion. The home is handed over.
You pay interest on each amount from the day the funds are released. Most lenders set interest-only repayments during the build, then switch to principal and interest once construction is complete. So the construction loan interest grows at every stage, and no rent comes in until the home is finished and tenanted.
If you buy land and construction on two contracts, the land loan usually settles first, so the mortgage on the land starts before the slab is even poured.
Each stage also means paperwork. Your builder sends a claim for each stage, and the lender usually sends a valuer to check the work before it releases the money.
How Does 10/90 Work?
10/90 is a purchase structure, not one of the loan products a bank sells. You pay 10% of the price to secure the property, and the remaining 90% at completion.
The builder funds the construction costs in the meantime. You are not making progress payments through the five stages, and you are not paying interest on a house that cannot be rented yet. Your home loan for the 90% settles when the home is finished, the same way it would on a completed property. That keeps your loan structure simple, with one loan drawn once at completion.
On the two 10/90 builds on our list right now, you pay the 10% once the contract goes unconditional. The balance is due at completion.
Construction Loan vs 10/90: Side by Side
Here is how the two compare on the same new build.
| Construction loan | 10/90 | |
|---|---|---|
| What you pay to start | A deposit, then the loan is drawn in stages | 10% to secure the property |
| How the builder is paid | Five progress payments, slab to completion | The builder funds the build |
| Interest during the build | On every stage drawn, from the day it is drawn | No construction loan, so no construction interest |
| Paperwork during the build | A claim and a bank check at each stage | None from your side |
| If the build runs late | Interest keeps running on what has been drawn | The builder carries more of the cost |
| When the rent starts | After completion | After completion |
| Suits you if | You are building on land you already own | You want to lock in today’s price and keep your cash free |
A construction loan suits someone building their own home on land they already own, where staged finance is the normal way to pay. 10/90 suits an investor buying a new build who wants to lock in the price today and keep their money working until the keys are ready.
Key takeaways
- A construction loan pays the builder in five progress payments, and you pay interest on each one from the day it is drawn.
- With 10/90, you pay 10% to secure a new build and the other 90% when it is finished.
- The builder funds the build under 10/90, so there is no construction loan and no construction interest.
- On an illustrative $710,900 build, an evenly drawn construction loan at an assumed 7% would cost about $22,400 in interest over 12 months.
- Our 10/90 list includes a 3 bedroom half duplex at Kelso, Townsville for $710,900 and 2 bedroom townhouses at Corio, Geelong from $609,900.
What Do You Pay During the Build?
Take the Goran Rise half duplex at $710,900. The interest rate and the build time below are assumptions for the illustration, not a quote.
With a construction loan at 90%: the loan is $639,810. At an assumed construction loan interest rate of 7%, interest on the full loan amount is about $44,800 a year. A construction loan is drawn in stages, so you would not pay all of that. If the loan were drawn evenly across a 12-month build, the interest would come to about $22,400, all of it paid before a tenant moves in.
With 10/90, you pay $71,090 to secure the property. The $639,810 is not needed until completion, so there is no construction interest to pay.
On this example, that is about $22,400 kept in your account instead of paid to the bank before any rent comes in.
Why Does the Builder Matter More Than the Loan?
Because the builder decides whether the home is finished on time and on budget. 3,472 construction companies entered external administration or had a controller appointed in the 2025-26 financial year.
With a construction loan, you pay for each stage as it is finished, so your money is in the house while it is still being built. With 10/90, the builder has funded the build, so you are not paying progress payments into a house that is half built.
We check every builder before we work with them. “The correct property, finished on time and on budget, is probably the biggest thing we try to do,” says our founder, Gil Elliott.
Builder figures are from ASIC insolvency statistics for the 2025-26 financial year. The interest example uses an assumed 7% rate and an even drawdown, for illustration only.
The 10/90 Properties We Like Right Now


New half duplex on 10/90, Kelso, Townsville
Kelso, Townsville QLD · 3 bed, 2.5 bath, 1 car · 148.5m² home
$710,900 · est. $570 to $590 a week · est. 4.17% to 4.32% gross yield
A full turnkey home on a single contract, down to the blinds, letterbox and turf, with completion estimated for September to October 2027. It is three minutes from Riverway Plaza shopping centre. We have five on our list. View the Brochure ›
New townhouse on 10/90, Corio, Geelong
Corio, Geelong VIC · 2 bed, 1 or 2 bath · 90m² to 100m²
From $609,900 · est. $500 to $510 a week · est. 4.26% to 4.35% gross yield
A single contract with completion estimated for the third quarter of 2027. It is about 12 minutes from the Geelong CBD. We have four on our list. View the Brochure ›
The Kelso half duplex gives you three bedrooms and 148.5m² of home, the size families look for when they rent. Corio gives you a lower entry price in Geelong. Both are 10% now and 90% at completion.
Not sure which one fits your budget? A short call is the quickest way to check the numbers, and the first conversation is free.
Construction Loan FAQs
How does a construction loan work?
Construction loans work by paying your builder in stages as the house is built, usually five: slab, frame, lock-up, fixing and completion. The lender releases funds as each stage is checked, and you pay interest on the amount drawn so far, usually interest only during the build. Once construction is complete, the loan switches to normal repayments. The interest grows at each stage, and it is paid before any rent comes in.
How do progress payments work on a construction loan?
Each progressive payment starts with a claim. Your builder sends one when a stage of the building contract is finished. The lender usually sends a valuer to check the work, then releases the money for that stage straight to the builder. Your loan balance goes up each time, and so does your interest. Under 10/90 there are no progress payments from your side, because the builder funds the build and you pay the 90% at completion.
What deposit do I need for a construction loan?
It depends on the lender and your situation. For construction finance, many lenders ask for a 20% deposit to avoid lenders mortgage insurance, and some accept less if you pay it, the same as for a standard home loan. On top of the deposit, you pay interest on each stage as it is drawn. On a 10/90 property, you pay 10% to secure it, and your finance for the other 90% settles when the home is finished. A mortgage broker can tell you what you can borrow.
What happens if construction is delayed?
With a construction loan, the interest on what has already been drawn keeps running while you wait, and the rent cannot start until the home is finished. A late build can add months of interest. Under 10/90, the builder has funded the build, so more of the cost of a delay sits with the builder instead of with you. It is also why we check every builder before we work with them.
How Positive Income Properties Helps
We work out what you can afford before we show you a property. Then we find one that fits your goal, check the builder, and stay with you through the build to handover. We arrange tenants and property management before you get the keys.
We do not have in-house brokers, conveyancers or insurers. We point you to independent professionals, and you are welcome to use your own, including having a 10/90 contract checked by someone who works for you.
If you would rather start with the plan than the property, that is the better order anyway. The first conversation is free.
If you would like to talk it through, book a call with a consultant.

Gil Elliott is the Managing Director and Founder of Positive Income Properties. Gil has a rich background in business consulting and property investment. All of these he gained in his nearly four decades of experience in the real estate and marketing industries.